Environmental Chamber PM / ISO 17025 System calibration
$ 699.6$ 419.76
Availability: 100 in stock
Country/Region of Manufacture:United States
MPN:www.acrcorp.net
Condition:New
All returns accepted:ReturnsNotAccepted
Model:ISO 17025 System calibration/PM contract
Description
Size Guide
Description
ACR Technical Services Introduces our gold care plan which covers the following:
Preventive maintenance (Two visits per 12 month cycle)
ISO 17025 System calibration (one visit per 12 month cycle)
10% off labor rates for repairs (During the 12 month contract period)
15% off travel rates (During the 12 month contract period)
10% off all parts that would be needed for repairs (During the 12 month contract period)
120 day labor warranty on all repairs (During the 12 month contract period)
ACR would provide the following pertaining to the Preventive maintenance service on your environmental chamber if applicable:
Preventative Maintenance Checklist
Customer Name: ------------------------------ Date: ____________________________
ACR WO# _________________________
Customer ID# ___________________________ Serial # ____________________________
Manufacturer ___________________________ Model # ____________________________
Description: _______________________________________________________________________
Note:
All of the following will be performed if applicable to the Chamber being serviced
Cabinet
Inspect and Lubricate all moving parts
Inspect door gaskets and plug ports
Inspect for loose hardware and fasteners
Refrigeration
Inspect for oil leaks
Inspect all copper lines
Check expansion valve bulb straps for tightness and check insulated bulbs
Connect manifold gauges
Check low stage standby pressure and high stage charge for full sight glass
Check compressor oil levels
Check refrigeration gauges for proper operation
Check and clean air-cooled condenser
Check water supply pressure and connections
Check adjustment of water valve to high stage
Check for operation on all expansion valves
Check for operation of the bypass regulator
Check bypass regulator setting
Check water regulator operation
Check operation of EPR
Check compressor pump down operation
Check solenoid operation
Check setting on low stage pressure switch
Check setting on high stage pressure switch
Electrical
Check for loose or frayed wires
Check all electrical contacts and all fuses
Check main power disconnect switch
Check supply voltage
Check amp draw of condenser fan motors
Check amp draw on circulator motor(s)
Check timers
During full pull down:
Check AMP draw of low stage compressor
Check AMP draw of high stage compressor
During full heat up:
Check amp draw on heater(s)
Instrumentation
Check for accuracy and proper operation of all instrumentation
Check the condition of sensors
Evaluation
Verify performance specifications
Report equipment condition to primary contact person
Options
Check amp draw on steam generator
Check amp draw on all other options
Check general condition on all options
Review monthly preventative maintenance with customer
Answer any questions that the customer may have
Comments:
Note:
ACR must provide all Parts for repairs.
Note: I will provide you with a updated fixed price which will include all travel expences once you give me your location. (We provide service Globally)